Sailing SV Delosβίντεο
First Look at Our Galley – We’re SPEECHLESS 🤯 (Aluminum Catamaran Build Pt. 36)
9 Μαΐου 2025 · 26 λεπτά · 384K προβολές
Τι καλύπτει αυτό το βίντεο
The crew of the SV Delos catamaran build project completes the galley fit-out, transitioning from design models to physical installation. After eight months of planning, the team works with their carpenter, Steve, to dry-fit the custom cabinetry, oven, and refrigeration units into the vessel.8:38 The process involves marking the boat's centerline on the shop floor to ensure precise placement of the kicks and frames.16:17 The team identifies and corrects potential high spots on the floor to prevent future alignment issues with the countertops and cabinetry.17:37 They prioritize galley flow and space efficiency, adjusting trash bin dimensions and storage layouts to maintain walk-through access even when the fridge is open.23:59 The build utilizes Australian white birch veneer sourced from 2019 wildfire firebreak clearing.5:17 The dry-fit confirms the design measurements before the installation of permanent flooring and final bolting.24:26 Careful planning and dry-fitting prevent cascading installation errors during the interior build-out.19:23
Περισσότερα από το Sailing SV Delos
Από Sailing SV Delos — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.
The Sailing Directory Newsletter
Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.



