Sailing SV Delosvideo
First Look at Our Galley – We’re SPEECHLESS 🤯 (Aluminum Catamaran Build Pt. 36)
9 de mayo de 2025 · 26 min · 384K vistas
¿Qué cubre este video?
The crew of the SV Delos catamaran build project completes the galley fit-out, transitioning from design models to physical installation. After eight months of planning, the team works with their carpenter, Steve, to dry-fit the custom cabinetry, oven, and refrigeration units into the vessel.8:38 The process involves marking the boat's centerline on the shop floor to ensure precise placement of the kicks and frames.16:17 The team identifies and corrects potential high spots on the floor to prevent future alignment issues with the countertops and cabinetry.17:37 They prioritize galley flow and space efficiency, adjusting trash bin dimensions and storage layouts to maintain walk-through access even when the fridge is open.23:59 The build utilizes Australian white birch veneer sourced from 2019 wildfire firebreak clearing.5:17 The dry-fit confirms the design measurements before the installation of permanent flooring and final bolting.24:26 Careful planning and dry-fitting prevent cascading installation errors during the interior build-out.19:23
Más de Sailing SV Delos
De Sailing SV Delos — ve el barco, la tripulación y cada video analizado del canal.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.



