Sailing SV Delosvidéo

First Look at Our Galley – We’re SPEECHLESS 🤯 (Aluminum Catamaran Build Pt. 36)

9 mai 2025 · 26 min · 385K vues

Ce que couvre cette vidéo

The crew of the SV Delos catamaran build project completes the galley fit-out, transitioning from design models to physical installation. After eight months of planning, the team works with their carpenter, Steve, to dry-fit the custom cabinetry, oven, and refrigeration units into the vessel.8:38 The process involves marking the boat's centerline on the shop floor to ensure precise placement of the kicks and frames.16:17 The team identifies and corrects potential high spots on the floor to prevent future alignment issues with the countertops and cabinetry.17:37 They prioritize galley flow and space efficiency, adjusting trash bin dimensions and storage layouts to maintain walk-through access even when the fridge is open.23:59 The build utilizes Australian white birch veneer sourced from 2019 wildfire firebreak clearing.5:17 The dry-fit confirms the design measurements before the installation of permanent flooring and final bolting.24:26 Careful planning and dry-fitting prevent cascading installation errors during the interior build-out.19:23

Regarder sur YouTube

Plus de vidéos de Sailing SV Delos

1 MILLION SUBS! WE DID IT! 🥳 🍺 🙏oct. 2026Building the Boat We’ve Always Dreamed Of 🛠️ Aluminum Catamaran Build pt. 90oct. 2026Whatever You Do…Don’t Push This ☠️ Aluminum Catamaran Build Pt. 89oct. 2026This Is Gonna Be SO FREAKING Cool! Aluminum Catamaran Build Pt. 88sept. 2026

De Sailing SV Delos — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème