Sailing SV Delosvideo

First Look at Our Galley – We’re SPEECHLESS 🤯 (Aluminum Catamaran Build Pt. 36)

May 9, 2025 · 26 min · 384K views

What this video covers

The crew of the SV Delos catamaran build project completes the galley fit-out, transitioning from design models to physical installation. After eight months of planning, the team works with their carpenter, Steve, to dry-fit the custom cabinetry, oven, and refrigeration units into the vessel.8:38 The process involves marking the boat's centerline on the shop floor to ensure precise placement of the kicks and frames.16:17 The team identifies and corrects potential high spots on the floor to prevent future alignment issues with the countertops and cabinetry.17:37 They prioritize galley flow and space efficiency, adjusting trash bin dimensions and storage layouts to maintain walk-through access even when the fridge is open.23:59 The build utilizes Australian white birch veneer sourced from 2019 wildfire firebreak clearing.5:17 The dry-fit confirms the design measurements before the installation of permanent flooring and final bolting.24:26 Careful planning and dry-fitting prevent cascading installation errors during the interior build-out.19:23

Watch on YouTube

More from Sailing SV Delos

This Is Where It Gets INTERESTING…Aluminum Catamaran Build Pt. 84Aug 2026EVERY INCH COUNTS....Aluminum Catamaran Build Pt. 83Aug 2026FIRST TEST: The Last Dinghy We'll Ever Buy??? Aluminum Catamaran Build Pt. 82Aug 2026Years of Work...One Flip of a Switch 🤯 Aluminum Catamaran Build Pt. 81Aug 2026

From Sailing SV Delos — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue