Sailing Magic Carpetvídeo
Building Rigging and Fiddlin' Around
25 de abril de 2025 · 23 min · 47K visitas · Steveston
Qué cubre este vídeo
The crew of Magic Carpet replaces their standing rigging at a professional rigging shop in Steveston, British Columbia, to address mast alignment issues.0:27 After discovering the mast was not centered within the cabin-top partners, the owners decide to shift the mast step, necessitating new wire lengths for the cap shrouds, intermediate shrouds, and lowers.1:23 Using the old rigging as a template, they measure the existing wires and set turnbuckles to match previous tuning marks.2:10 They utilize Stay-Lok mechanical fittings for the new wire terminations, which allow for easier inspection and field assembly compared to swaged fittings.7:04 The process involves cutting new wire to length, installing the mechanical top fittings, and verifying measurements against the original setup.7:22 The crew plans to finalize the assembly and step the mast after completing other refit projects, including an electric windlass installation, a new electrical system design, and lightning protection.18:05 Mechanical fittings like Stay-Lok allow for precise, DIY-friendly standing rigging replacement when using existing shrouds as length templates.13:42
Más de Sailing Magic Carpet
De Sailing Magic Carpet — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



