Sailing Magic Carpetvideo

Building Rigging and Fiddlin' Around

25 April 2025 · 23 min · 47K views · Steveston

What this video covers

The crew of Magic Carpet replaces their standing rigging at a professional rigging shop in Steveston, British Columbia, to address mast alignment issues.0:27 After discovering the mast was not centered within the cabin-top partners, the owners decide to shift the mast step, necessitating new wire lengths for the cap shrouds, intermediate shrouds, and lowers.1:23 Using the old rigging as a template, they measure the existing wires and set turnbuckles to match previous tuning marks.2:10 They utilize Stay-Lok mechanical fittings for the new wire terminations, which allow for easier inspection and field assembly compared to swaged fittings.7:04 The process involves cutting new wire to length, installing the mechanical top fittings, and verifying measurements against the original setup.7:22 The crew plans to finalize the assembly and step the mast after completing other refit projects, including an electric windlass installation, a new electrical system design, and lightning protection.18:05 Mechanical fittings like Stay-Lok allow for precise, DIY-friendly standing rigging replacement when using existing shrouds as length templates.13:42

Watch on YouTube

More from Sailing Magic Carpet

We're Starting to Lose Our MindsOct 2026We Found An Old Map Leading Us To Hotsprings...Oct 2026A Mysterious Presence on this Northern IslandSept 2026Sailing Northern Canada | Alone and at PeaceSept 2026

From Sailing Magic Carpet — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue