Sailing Magic Carpetvidéo

Building Rigging and Fiddlin' Around

25 avril 2025 · 23 min · 47K vues · Steveston

Ce que couvre cette vidéo

The crew of Magic Carpet replaces their standing rigging at a professional rigging shop in Steveston, British Columbia, to address mast alignment issues.0:27 After discovering the mast was not centered within the cabin-top partners, the owners decide to shift the mast step, necessitating new wire lengths for the cap shrouds, intermediate shrouds, and lowers.1:23 Using the old rigging as a template, they measure the existing wires and set turnbuckles to match previous tuning marks.2:10 They utilize Stay-Lok mechanical fittings for the new wire terminations, which allow for easier inspection and field assembly compared to swaged fittings.7:04 The process involves cutting new wire to length, installing the mechanical top fittings, and verifying measurements against the original setup.7:22 The crew plans to finalize the assembly and step the mast after completing other refit projects, including an electric windlass installation, a new electrical system design, and lightning protection.18:05 Mechanical fittings like Stay-Lok allow for precise, DIY-friendly standing rigging replacement when using existing shrouds as length templates.13:42

Regarder sur YouTube

Plus de vidéos de Sailing Magic Carpet

The Hermit of the Goose Groupoct. 2026We're Starting to Lose Our Mindsoct. 2026We Found An Old Map Leading Us To Hotsprings...oct. 2026A Mysterious Presence on this Northern Islandsept. 2026

De Sailing Magic Carpet — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème