Sailing Magic Carpetvidéo

Building Rigging and Fiddlin' Around

25 avril 2025 · 23 min · 47K vues · Steveston

Ce que couvre cette vidéo

The crew of Magic Carpet replaces their standing rigging at a professional rigging shop in Steveston, British Columbia, to address mast alignment issues.0:27 After discovering the mast was not centered within the cabin-top partners, the owners decide to shift the mast step, necessitating new wire lengths for the cap shrouds, intermediate shrouds, and lowers.1:23 Using the old rigging as a template, they measure the existing wires and set turnbuckles to match previous tuning marks.2:10 They utilize Stay-Lok mechanical fittings for the new wire terminations, which allow for easier inspection and field assembly compared to swaged fittings.7:04 The process involves cutting new wire to length, installing the mechanical top fittings, and verifying measurements against the original setup.7:22 The crew plans to finalize the assembly and step the mast after completing other refit projects, including an electric windlass installation, a new electrical system design, and lightning protection.18:05 Mechanical fittings like Stay-Lok allow for precise, DIY-friendly standing rigging replacement when using existing shrouds as length templates.13:42

Regarder sur YouTube

Plus de vidéos de Sailing Magic Carpet

Sailing Northern Canada | Fishing, Beachcombing.août 2026Suddenly, The Boat Wasn't Where We Left It [Ep 3]août 2026An Island That Google Maps Can't See [Ep 2]août 2026We're Sailing to Mexico [Episode 1]août 2026

De Sailing Magic Carpet — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème