Entre Terras e Maresvídeo

FINALMENTE CONCLUIMOS o TETO da COZINTA T1.ep170

15 de marzo de 2026 · 38 min · 397 visitas

Qué cubre este vídeo

Edgar and Sâmia complete the ceiling installation in the galley of their boat, refining the mounting technique for the overhead panels.37:17 To secure the panels, they use Fastmount fasteners, which allow for a removable, flush-fit finish.4:32 Unlike previous attempts where they screwed fasteners directly into the wood, they now countersink the screws and bond the mounting pieces with cyanoacrylate and epoxy to ensure structural integrity.4:29 The process involves cutting panels to size, waterproofing the wood with epoxy, and using a mixture of epoxy and Aerosil for bonding.13:05 Despite initial alignment challenges and minor fitting errors during the installation of the ceiling plates, the team successfully achieves a clean, uniform look.8:20 The final assembly features a modular design that allows for future access to the ceiling cavity while maintaining a finished appearance.29:19 The project concludes with the panels securely locked in place, providing a stable and aesthetically improved galley ceiling.37:06

Ver en YouTube

Más de Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183jul 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182jun 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181jun 2026This week the focus was on something elsejun 2026

De Entre Terras e Mares — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema