Entre Terras e Maresvideo
FINALMENTE CONCLUIMOS o TETO da COZINTA T1.ep170
15 March 2026 · 38 min · 397 views
What this video covers
Edgar and Sâmia complete the ceiling installation in the galley of their boat, refining the mounting technique for the overhead panels.37:17 To secure the panels, they use Fastmount fasteners, which allow for a removable, flush-fit finish.4:32 Unlike previous attempts where they screwed fasteners directly into the wood, they now countersink the screws and bond the mounting pieces with cyanoacrylate and epoxy to ensure structural integrity.4:29 The process involves cutting panels to size, waterproofing the wood with epoxy, and using a mixture of epoxy and Aerosil for bonding.13:05 Despite initial alignment challenges and minor fitting errors during the installation of the ceiling plates, the team successfully achieves a clean, uniform look.8:20 The final assembly features a modular design that allows for future access to the ceiling cavity while maintaining a finished appearance.29:19 The project concludes with the panels securely locked in place, providing a stable and aesthetically improved galley ceiling.37:06
More from Entre Terras e Mares
From Entre Terras e Mares — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



