Mais
Idioma
Modo de visualização
Entre Terras e Maresvídeo
15 de março de 2026 · 38 min · 392 visualizações
O que este vídeo aborda
Edgar and Sâmia complete the ceiling installation in the galley of their boat, refining the mounting technique for the overhead panels. To secure the panels, they use Fastmount fasteners, which allow for a removable, flush-fit finish.▶ 4:29 Unlike previous attempts where they screwed fasteners directly into the wood, they now countersink the screws and bond the mounting pieces with cyanoacrylate and epoxy to ensure structural integrity.▶ 4:29 The process involves cutting panels to size, waterproofing the wood with epoxy, and using a mixture of epoxy and Aerosil for bonding.▶ 13:08 Despite initial alignment challenges and minor fitting errors during the installation of the ceiling plates, the team successfully achieves a clean, uniform look.▶ 16:11 The final assembly features a modular design that allows for future access to the ceiling cavity while maintaining a finished appearance.▶ 29:16 The project concludes with the panels securely locked in place, providing a stable and aesthetically improved galley ceiling.▶ 37:19
Mais de Entre Terras e Mares
De Entre Terras e Mares — veja o barco, a tripulação e todos os vídeos analisados do canal.