Salt & Tarvídeo

Salt & Tar: Ep.110- All in a Days Work

22 de octubre de 2020 · 26 min · 74K visitas · California

Qué cubre este vídeo

Garrett and Ruth continue the custom build of their boat, Red Aviva, focusing on engine systems and deck infrastructure. Garrett completes the raw water cooling system, installing a new starter motor, wiring the electrical components, and routing hoses from the through-hull to the strainer.0:44 He plans to replace all cooling hoses and fluids before testing the engine.0:56 Additionally, the pair constructs a large wooden deck box to house engine controls, gauges, and plumbing for emergency bilge pumps and pressurized deck wash-down systems.3:37 They determine the box's placement on the aft deck by aligning it with the deck planking and securing it through the mast partner and deck beams using heavy internal cleats, bolts, and adhesive sealant.9:50 The top of the box will feature traditional caulked planking with a piano hinge and gasket seal.17:06 The project aims to prepare the vessel for coastal cruising in Southern California and Mexico.13:49

Ver en YouTube

Más de Salt & Tar

Salt & Tar: Ep.357- Finishing What We Startedsept 2026Salt & Tar: Ep.356- Dock Lifeago 2026Salt & Tar: Ep.355- Serenely Afloat in a Hustling Harborago 2026Salt & Tar: Ep.354- Enjoying the Sensation of Floatingago 2026

De Salt & Tar — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema