Salt & Tarvideo

Salt & Tar: Ep.110- All in a Days Work

October 22, 2020 · 26 min · 74K views · California

What this video covers

Garrett and Ruth continue the custom build of their boat, Red Aviva, focusing on engine systems and deck infrastructure. Garrett completes the raw water cooling system, installing a new starter motor, wiring the electrical components, and routing hoses from the through-hull to the strainer.0:44 He plans to replace all cooling hoses and fluids before testing the engine.0:56 Additionally, the pair constructs a large wooden deck box to house engine controls, gauges, and plumbing for emergency bilge pumps and pressurized deck wash-down systems.3:37 They determine the box's placement on the aft deck by aligning it with the deck planking and securing it through the mast partner and deck beams using heavy internal cleats, bolts, and adhesive sealant.9:50 The top of the box will feature traditional caulked planking with a piano hinge and gasket seal.17:06 The project aims to prepare the vessel for coastal cruising in Southern California and Mexico.13:49

Watch on YouTube

More from Salt & Tar

Salt & Tar: Ep.357- Finishing What We StartedSep 2026Salt & Tar: Ep.356- Dock LifeAug 2026Salt & Tar: Ep.355- Serenely Afloat in a Hustling HarborAug 2026Salt & Tar: Ep.354- Enjoying the Sensation of FloatingAug 2026

From Salt & Tar — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue