Salt & Tarvídeo

Salt & Tar: Ep.110- All in a Days Work

22 de outubro de 2020 · 26 min · 74K visualizações · California

O que este vídeo aborda

Garrett and Ruth continue the custom build of their boat, Red Aviva, focusing on engine systems and deck infrastructure. Garrett completes the raw water cooling system, installing a new starter motor, wiring the electrical components, and routing hoses from the through-hull to the strainer.0:44 He plans to replace all cooling hoses and fluids before testing the engine.0:56 Additionally, the pair constructs a large wooden deck box to house engine controls, gauges, and plumbing for emergency bilge pumps and pressurized deck wash-down systems.3:37 They determine the box's placement on the aft deck by aligning it with the deck planking and securing it through the mast partner and deck beams using heavy internal cleats, bolts, and adhesive sealant.9:50 The top of the box will feature traditional caulked planking with a piano hinge and gasket seal.17:06 The project aims to prepare the vessel for coastal cruising in Southern California and Mexico.13:49

Ver no YouTube

Mais de Salt & Tar

Salt & Tar: Ep.357- Finishing What We Started09/2026Salt & Tar: Ep.356- Dock Life08/2026Salt & Tar: Ep.355- Serenely Afloat in a Hustling Harbor08/2026Salt & Tar: Ep.354- Enjoying the Sensation of Floating08/2026

De Salt & Tar — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema