Climbing the sailboat mast to sort out our lights and other things | Land Rats | EP44
30 de mayo de 2021 · 14 min · 263 visitas
Qué cubre este vídeo
Replacing masthead lights requires multiple ascents using a bosun's chair, a drill, and pop rivets to secure new hardware.0:25 The project involves installing a new tricolor light, an anchor light, and a radar reflector, while replacing old wiring with new cables routed through the mast.6:00 To save costs, an existing light housing is modified to serve as the backlight for the tricolor, with the internal reflector painted to achieve the required 135-degree arc.6:27 Connections at the base of the mast are protected using a gel insulation kit and heat-shrink tubing before being wired into the distribution fuse box.11:26 During the installation, the crew encounters a slipping winch, requiring maintenance before the ascent can continue.1:07 Weather delays interrupt the work, forcing the crew to pause and resume over several days.9:38 Final testing confirms the tricolor and anchor lights function, though the deck light requires further troubleshooting at the masthead.12:51
Más de Land Rats on a Bartered Sailboat
De Land Rats on a Bartered Sailboat — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



