Climbing the sailboat mast to sort out our lights and other things | Land Rats | EP44
30 de maio de 2021 · 14 min · 263 visualizações
O que este vídeo aborda
Replacing masthead lights requires multiple ascents using a bosun's chair, a drill, and pop rivets to secure new hardware.0:25 The project involves installing a new tricolor light, an anchor light, and a radar reflector, while replacing old wiring with new cables routed through the mast.6:00 To save costs, an existing light housing is modified to serve as the backlight for the tricolor, with the internal reflector painted to achieve the required 135-degree arc.6:27 Connections at the base of the mast are protected using a gel insulation kit and heat-shrink tubing before being wired into the distribution fuse box.11:26 During the installation, the crew encounters a slipping winch, requiring maintenance before the ascent can continue.1:07 Weather delays interrupt the work, forcing the crew to pause and resume over several days.9:38 Final testing confirms the tricolor and anchor lights function, though the deck light requires further troubleshooting at the masthead.12:51
Mais de Land Rats on a Bartered Sailboat
De Land Rats on a Bartered Sailboat — veja o barco, a tripulação e todos os vídeos analisados do canal.
The Sailing Directory Newsletter
Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.



