Land Rats on a Bartered Sailboatvidéo

Climbing the sailboat mast to sort out our lights and other things | Land Rats | EP44

30 mai 2021 · 14 min · 263 vues

Ce que couvre cette vidéo

Replacing masthead lights requires multiple ascents using a bosun's chair, a drill, and pop rivets to secure new hardware.0:25 The project involves installing a new tricolor light, an anchor light, and a radar reflector, while replacing old wiring with new cables routed through the mast.6:00 To save costs, an existing light housing is modified to serve as the backlight for the tricolor, with the internal reflector painted to achieve the required 135-degree arc.6:27 Connections at the base of the mast are protected using a gel insulation kit and heat-shrink tubing before being wired into the distribution fuse box.11:26 During the installation, the crew encounters a slipping winch, requiring maintenance before the ascent can continue.1:07 Weather delays interrupt the work, forcing the crew to pause and resume over several days.9:38 Final testing confirms the tricolor and anchor lights function, though the deck light requires further troubleshooting at the masthead.12:51

Regarder sur YouTube

Plus de vidéos de Land Rats on a Bartered Sailboat

Sailing across country borders, International Sailing, South Africa to Namibia | Land Rats | EP70juil. 2022Exploring Richards bay and sailing back to Durban | Land Rats | EP60oct. 2021Offshore Sailing, first passage on our Steel boat, Durban to Richards Bay | Land Rats | EP59oct. 2021Out Sailingsept. 2021

De Land Rats on a Bartered Sailboat — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème