Sailing Squibvídeo

Reacondicionamiento de Squib - Instalación de estantes, armario de radioaficionado - Extensión de plataforma, inodoro - Regala...

19 de junio de 2025 · 17 min · 624 visitas

Qué cubre este vídeo

The crew of the sailboat Squib performs several interior and exterior refit projects, focusing on storage, drainage, and equipment mounting. They install a custom cabinet for an amateur radio unit in the aft cabin, securing it with both screws and thickened epoxy. To prevent water from dripping into cockpit lockers, they mount a rain gutter along the cabin roof, creating a slight slope toward both port and starboard to ensure drainage. The project also includes fabricating a platform extension for the toilet, which involves laminating a cover and grinding the surrounding gelcoat to prepare for epoxy bonding. During the installation of a new shelf in the forward cabin, the crew discovers that the board obstructs the removal of a window, prompting plans to modify the plexiglass pane with a hinge. The work requires precise sanding, filling gaps with epoxy, and waiting for low-temperature curing cycles.

Ver en YouTube

Más de Sailing Squib

Sailing Squib - May 2026/3sept 2026Sailing Squib May 2026 /2ago 2026Sailing Squib - Contemporary Witnessjul 2026Sailing Squib - May 2026 /1jul 2026

De Sailing Squib — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema