Sailing Squibvideo

Squib's Refit - Installing shelves, amateur radio cabinet - Platform extension toilet - Rubbing strake...

19 June 2025 · 17 min · 624 views

What this video covers

The crew of the sailboat Squib performs several interior and exterior refit projects, focusing on storage, drainage, and equipment mounting. They install a custom cabinet for an amateur radio unit in the aft cabin, securing it with both screws and thickened epoxy. To prevent water from dripping into cockpit lockers, they mount a rain gutter along the cabin roof, creating a slight slope toward both port and starboard to ensure drainage. The project also includes fabricating a platform extension for the toilet, which involves laminating a cover and grinding the surrounding gelcoat to prepare for epoxy bonding. During the installation of a new shelf in the forward cabin, the crew discovers that the board obstructs the removal of a window, prompting plans to modify the plexiglass pane with a hinge. The work requires precise sanding, filling gaps with epoxy, and waiting for low-temperature curing cycles.

Watch on YouTube

More from Sailing Squib

Sailing Squib - May 2026/3Sept 2026Sailing Squib May 2026 /2Aug 2026Sailing Squib - Contemporary WitnessJul 2026Sailing Squib - May 2026 /1Jul 2026

From Sailing Squib — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue