Entre Terras e Maresvídeo
WE FINALLY STARTED THE KITCHEN CEILING PART 1 S1. ep169
8 de marzo de 2026 · 20 min · 211 visitas
Qué cubre este vídeo
Edgar and Sâmia fabricate and install fiberglass ceiling panels for the interior of their boat.0:53 They laminate fiberglass sheets using 450-gram mat, glass, and release agent, then prepare wooden supports to mount the ceiling finish using Fast Mount hardware.1:27 To secure the wooden supports to the overhead, they test a two-minute polyurethane adhesive combined with cyanoacrylate.3:04 The adhesive fails to set within the advertised time, requiring the crew to hold the pieces in place manually for nearly ten minutes.12:12 The pair concludes that the fast-setting polyurethane does not expand or cure as effectively as their standard, slower-curing adhesive.12:32 After positioning the supports, they identify necessary adjustments to the mounting angles and hole alignments to accommodate the ceiling's curvature.17:58 The project remains ongoing as they await the purchase of LED profiles to complete the final installation and finish.19:32
Más de Entre Terras e Mares
De Entre Terras e Mares — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



