Entre Terras e Maresvideo

WE FINALLY STARTED THE KITCHEN CEILING PART 1 S1. ep169

March 8, 2026 · 20 min · 211 views

What this video covers

Edgar and Sâmia fabricate and install fiberglass ceiling panels for the interior of their boat.0:53 They laminate fiberglass sheets using 450-gram mat, glass, and release agent, then prepare wooden supports to mount the ceiling finish using Fast Mount hardware.1:27 To secure the wooden supports to the overhead, they test a two-minute polyurethane adhesive combined with cyanoacrylate.3:04 The adhesive fails to set within the advertised time, requiring the crew to hold the pieces in place manually for nearly ten minutes.12:12 The pair concludes that the fast-setting polyurethane does not expand or cure as effectively as their standard, slower-curing adhesive.12:32 After positioning the supports, they identify necessary adjustments to the mounting angles and hole alignments to accommodate the ceiling's curvature.17:58 The project remains ongoing as they await the purchase of LED profiles to complete the final installation and finish.19:32

Watch on YouTube

More from Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183Jul 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182Jun 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181Jun 2026This week the focus was on something elseJun 2026

From Entre Terras e Mares — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue