Entre Terras e Maresvidéo
WE FINALLY STARTED THE KITCHEN CEILING PART 1 S1. ep169
8 mars 2026 · 20 min · 211 vues
Ce que couvre cette vidéo
Edgar and Sâmia fabricate and install fiberglass ceiling panels for the interior of their boat.0:53 They laminate fiberglass sheets using 450-gram mat, glass, and release agent, then prepare wooden supports to mount the ceiling finish using Fast Mount hardware.1:27 To secure the wooden supports to the overhead, they test a two-minute polyurethane adhesive combined with cyanoacrylate.3:04 The adhesive fails to set within the advertised time, requiring the crew to hold the pieces in place manually for nearly ten minutes.12:12 The pair concludes that the fast-setting polyurethane does not expand or cure as effectively as their standard, slower-curing adhesive.12:32 After positioning the supports, they identify necessary adjustments to the mounting angles and hole alignments to accommodate the ceiling's curvature.17:58 The project remains ongoing as they await the purchase of LED profiles to complete the final installation and finish.19:32
Plus de vidéos de Entre Terras e Mares
De Entre Terras e Mares — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



