Entre Terras e Maresvidéo

WE FINALLY STARTED THE KITCHEN CEILING PART 1 S1. ep169

8 mars 2026 · 20 min · 211 vues

Ce que couvre cette vidéo

Edgar and Sâmia fabricate and install fiberglass ceiling panels for the interior of their boat.0:53 They laminate fiberglass sheets using 450-gram mat, glass, and release agent, then prepare wooden supports to mount the ceiling finish using Fast Mount hardware.1:27 To secure the wooden supports to the overhead, they test a two-minute polyurethane adhesive combined with cyanoacrylate.3:04 The adhesive fails to set within the advertised time, requiring the crew to hold the pieces in place manually for nearly ten minutes.12:12 The pair concludes that the fast-setting polyurethane does not expand or cure as effectively as their standard, slower-curing adhesive.12:32 After positioning the supports, they identify necessary adjustments to the mounting angles and hole alignments to accommodate the ceiling's curvature.17:58 The project remains ongoing as they await the purchase of LED profiles to complete the final installation and finish.19:32

Regarder sur YouTube

Plus de vidéos de Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183juil. 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182juin 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181juin 2026This week the focus was on something elsejuin 2026

De Entre Terras e Mares — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème