Project Brupegvídeo
Mistakes were made, let's move on... Project Brupeg Ep.346
10 de marzo de 2024 · 36 min · 34K visitas · Bundaberg
Qué cubre este vídeo
The owners of the former fishing trawler *Brewpeg* face a series of electrical and mechanical failures while preparing the vessel for a planned departure from Bundaberg, Australia. The solar power system suffers multiple charge controller failures, including high-voltage input errors and internal shorts, which the crew traces to corrosion in cabling and a lack of proper fusing between the solar panels and the controllers.10:05 After replacing damaged cables and installing necessary fuses, the crew discovers that several charge controllers have lost significant charging capacity and remain undersized for the boat's 20-amp baseload.19:46 Separately, the crew attempts to modify a gravity-fed fuel injector on the generator to accommodate a pressurized fuel system.28:41 By TIG welding a custom hose barb fitting onto the injector return line, they create a more secure connection, though they acknowledge the process risks damaging internal O-rings.29:17 The project highlights the risks of bypassing standard electrical protection and the challenges of retrofitting components for systems exceeding their original design specifications.
Más de Project Brupeg
De Project Brupeg — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



