Project Brupegvideo
Mistakes were made, let's move on... Project Brupeg Ep.346
10 marzo 2024 · 36 min · 34K visualizzazioni · Bundaberg
Cosa tratta questo video
The owners of the former fishing trawler *Brewpeg* face a series of electrical and mechanical failures while preparing the vessel for a planned departure from Bundaberg, Australia. The solar power system suffers multiple charge controller failures, including high-voltage input errors and internal shorts, which the crew traces to corrosion in cabling and a lack of proper fusing between the solar panels and the controllers.10:05 After replacing damaged cables and installing necessary fuses, the crew discovers that several charge controllers have lost significant charging capacity and remain undersized for the boat's 20-amp baseload.19:46 Separately, the crew attempts to modify a gravity-fed fuel injector on the generator to accommodate a pressurized fuel system.28:41 By TIG welding a custom hose barb fitting onto the injector return line, they create a more secure connection, though they acknowledge the process risks damaging internal O-rings.29:17 The project highlights the risks of bypassing standard electrical protection and the challenges of retrofitting components for systems exceeding their original design specifications.
Altro da Project Brupeg
Da Project Brupeg — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



