Project Brupegvideo

Mistakes were made, let's move on... Project Brupeg Ep.346

10 March 2024 · 36 min · 34K views · Bundaberg

What this video covers

The owners of the former fishing trawler *Brewpeg* face a series of electrical and mechanical failures while preparing the vessel for a planned departure from Bundaberg, Australia. The solar power system suffers multiple charge controller failures, including high-voltage input errors and internal shorts, which the crew traces to corrosion in cabling and a lack of proper fusing between the solar panels and the controllers.10:05 After replacing damaged cables and installing necessary fuses, the crew discovers that several charge controllers have lost significant charging capacity and remain undersized for the boat's 20-amp baseload.19:46 Separately, the crew attempts to modify a gravity-fed fuel injector on the generator to accommodate a pressurized fuel system.28:41 By TIG welding a custom hose barb fitting onto the injector return line, they create a more secure connection, though they acknowledge the process risks damaging internal O-rings.29:17 The project highlights the risks of bypassing standard electrical protection and the challenges of retrofitting components for systems exceeding their original design specifications.

Watch on YouTube

More from Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463Oct 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462Sept 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461Sept 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460Sept 2026

From Project Brupeg — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue