Sven Yrvindvídeo
15 Aug 2025 Hardware on Starboard side installed permamentally
14 de agosto de 2025 · 2 min · 1K visitas
Qué cubre este vídeo
Sven Yrvind installs permanent hardware on the starboard side of his vessel using 4mm yellow Dyneema rope with a 700kg breaking strength.▶ 0:05 He secures the hatches using the Dyneema line, which he selected for its high strength-to-weight ratio.▶ 0:05 The structural work involves applying epoxy and carbon fiber to a reinforced wedge.▶ 0:56 He wets out the carbon fiber on a film before transferring the material to the hull structure.▶ 1:00 He creates fillets at the base of the reinforcement to ensure a secure bond.▶ 1:46 The process includes securing polyester strings to the exterior to maintain tension while the epoxy cures.▶ 1:13 These modifications aim to reinforce the starboard side of the boat, which is designed to heel past 90 degrees.▶ 0:48
Más de Sven Yrvind
De Sven Yrvind — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



