Sven Yrvindvideo
15 Aug 2025 Hardware on Starboard side installed permamentally
14 August 2025 · 2 min · 1K views
What this video covers
Sven Yrvind installs permanent hardware on the starboard side of his vessel using 4mm yellow Dyneema rope with a 700kg breaking strength.▶ 0:05 He secures the hatches using the Dyneema line, which he selected for its high strength-to-weight ratio.▶ 0:05 The structural work involves applying epoxy and carbon fiber to a reinforced wedge.▶ 0:56 He wets out the carbon fiber on a film before transferring the material to the hull structure.▶ 1:00 He creates fillets at the base of the reinforcement to ensure a secure bond.▶ 1:46 The process includes securing polyester strings to the exterior to maintain tension while the epoxy cures.▶ 1:13 These modifications aim to reinforce the starboard side of the boat, which is designed to heel past 90 degrees.▶ 0:48
More from Sven Yrvind
From Sven Yrvind — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



