Project Brupegvídeo
Straightening Metal & Cabin Woodworking - Project Brupeg Ep. 159
13 de julio de 2020 · 39 min · 49K visitas
Qué cubre este vídeo
The conversion of a former fishing trawler into an expedition vessel continues with interior cabin construction and metal fabrication. The crew builds a new office bench and custom bunk furniture, including a headboard and leeboard, using 17mm plywood.6:44 To prevent rot and odors, all wooden components receive a multi-layer epoxy coating, sanded to a 240-grit finish for a smooth surface.38:11
Simultaneously, the team addresses structural warpage in steel sliders.0:14 After initial attempts to counteract heat-induced bending failed, they implement a new welding strategy: alternating six-to-eight-inch welds on opposite sides to balance contraction forces.32:35 They also use custom-cut steel wedges to hold the metal at a 43mm gap during the cooling process, combined with scrap alloy bar as a heat sink to maintain dimensional stability.33:26 A damaged MIG torch lead, previously suspected of causing gas flow issues, is identified and managed.26:47 The project remains focused on interior fit-out and structural steel alignment before the vessel returns to the water.
Más de Project Brupeg
De Project Brupeg — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



