Project Brupegvídeo

Straightening Metal & Cabin Woodworking - Project Brupeg Ep. 159

13 de julho de 2020 · 39 min · 49K visualizações

O que este vídeo aborda

The conversion of a former fishing trawler into an expedition vessel continues with interior cabin construction and metal fabrication. The crew builds a new office bench and custom bunk furniture, including a headboard and leeboard, using 17mm plywood.6:44 To prevent rot and odors, all wooden components receive a multi-layer epoxy coating, sanded to a 240-grit finish for a smooth surface.38:11

Simultaneously, the team addresses structural warpage in steel sliders.0:14 After initial attempts to counteract heat-induced bending failed, they implement a new welding strategy: alternating six-to-eight-inch welds on opposite sides to balance contraction forces.32:35 They also use custom-cut steel wedges to hold the metal at a 43mm gap during the cooling process, combined with scrap alloy bar as a heat sink to maintain dimensional stability.33:26 A damaged MIG torch lead, previously suspected of causing gas flow issues, is identified and managed.26:47 The project remains focused on interior fit-out and structural steel alignment before the vessel returns to the water.

Ver no YouTube

Mais de Project Brupeg

What caused the steering to fail - Project Brupeg Ep.46310/2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.46209/2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.46109/2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.46009/2026

De Project Brupeg — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema