Sailing NVvídeo
The Dirtiest & Most Critical Stage of Our Engine Install | S2 Ep 68
31 de agosto de 2025 · 22 min · 6K visitas · Fiji
Qué cubre este vídeo
Timo replaces the engine bed on the 40-ft yacht NV to accommodate a new engine, a process requiring precise alignment and structural modification. After removing the old engine, exhaust, and fuel systems, he cleans the engine room and organizes a decade of accumulated, poorly routed electrical cables.2:16 To remove the existing fiberglass engine bed, he uses an oscillating multi-tool to minimize dust, followed by a grinder to clear the remaining structure.4:41 During removal, he discovers water trapped within the old bed’s isolated fiberglass structure, likely originating from the sail drive seal bolts.5:19 The new engine bed requires careful trimming to clear an existing bulkhead while maintaining structural rigidity and ensuring adequate clearance for the propeller.10:28 Timo uses soapy water during grinding to suppress fiberglass dust and plans to laminate the new bed directly to the hull to ensure a complete, watertight bond.9:22 The project requires balancing the need for propeller clearance with the structural integrity of the hull’s bulkhead and engine mounting points.
Más de Sailing NV
De Sailing NV — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



