Sailing NVvídeo

The Dirtiest & Most Critical Stage of Our Engine Install | S2 Ep 68

31 de agosto de 2025 · 22 min · 6K visualizações · Fiji

O que este vídeo aborda

Timo replaces the engine bed on the 40-ft yacht NV to accommodate a new engine, a process requiring precise alignment and structural modification. After removing the old engine, exhaust, and fuel systems, he cleans the engine room and organizes a decade of accumulated, poorly routed electrical cables.2:16 To remove the existing fiberglass engine bed, he uses an oscillating multi-tool to minimize dust, followed by a grinder to clear the remaining structure.4:41 During removal, he discovers water trapped within the old bed’s isolated fiberglass structure, likely originating from the sail drive seal bolts.5:19 The new engine bed requires careful trimming to clear an existing bulkhead while maintaining structural rigidity and ensuring adequate clearance for the propeller.10:28 Timo uses soapy water during grinding to suppress fiberglass dust and plans to laminate the new bed directly to the hull to ensure a complete, watertight bond.9:22 The project requires balancing the need for propeller clearance with the structural integrity of the hull’s bulkhead and engine mounting points.

Ver no YouTube

Mais de Sailing NV

Our Engine Room Is Flooding… Where Is the Water Coming From? | S3 Ep 2109/2026BEFORE YOU SERVICE YOUR MARINE DIESEL, WATCH THIS! | Nanni N4.65 Full Service09/2026How to Save Your Boat at Anchor: 2-Anchor Systems Explained | S3 Ep 2008/2026We Didn't See This Coming... | S3 Ep 1908/2026

De Sailing NV — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema