Sailing NVvideo

The Dirtiest & Most Critical Stage of Our Engine Install | S2 Ep 68

August 31, 2025 · 22 min · 6K views · Fiji

What this video covers

Timo replaces the engine bed on the 40-ft yacht NV to accommodate a new engine, a process requiring precise alignment and structural modification. After removing the old engine, exhaust, and fuel systems, he cleans the engine room and organizes a decade of accumulated, poorly routed electrical cables.2:16 To remove the existing fiberglass engine bed, he uses an oscillating multi-tool to minimize dust, followed by a grinder to clear the remaining structure.4:41 During removal, he discovers water trapped within the old bed’s isolated fiberglass structure, likely originating from the sail drive seal bolts.5:19 The new engine bed requires careful trimming to clear an existing bulkhead while maintaining structural rigidity and ensuring adequate clearance for the propeller.10:28 Timo uses soapy water during grinding to suppress fiberglass dust and plans to laminate the new bed directly to the hull to ensure a complete, watertight bond.9:22 The project requires balancing the need for propeller clearance with the structural integrity of the hull’s bulkhead and engine mounting points.

Watch on YouTube

More from Sailing NV

BEFORE YOU SERVICE YOUR MARINE DIESEL, WATCH THIS! | Nanni N4.65 Full ServiceSep 2026How to Save Your Boat at Anchor: 2-Anchor Systems Explained | S3 Ep 20Aug 2026We Didn't See This Coming... | S3 Ep 19Aug 2026A Turning Point for Our Race Boat | S3 Ep 18Jul 2026

From Sailing NV — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue