RAN Sailingvídeo
New Milestone Reached! Keel Grid Finalised - Ep. 421 RAN Sailing
20 de diciembre de 2024 · 22 min · 118K visitas · Sweden
Qué cubre este vídeo
Johan and Malin complete the keel grid lamination for their boat build, transitioning from structural stringer work to interior bulkhead installation.21:19 The process involves laminating stringers in cold conditions, requiring a temporary plastic enclosure around the hull and a 25–30 kilowatt diesel heater to maintain an internal temperature of 13–14 degrees Celsius.15:17 To improve efficiency, the team uses a saturation table equipped with an infrared heater to pre-saturate fiberglass layers before application.7:43 Despite these preparations, the work proves time-consuming due to the complex geometry of the stringers, which feature 90-degree corners and limber holes.11:57 Vacuum bagging the laminate presents further challenges, exacerbated by a degrading vacuum pump that struggles to evacuate air quickly, forcing the crew to meticulously seal even minor leaks to maintain proper pressure.20:26 After three days of intensive labor, the keel grid is finalized, marking the end of the structural foundation phase.19:29
Más de RAN Sailing
De RAN Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



