RAN Sailingvideo

New Milestone Reached! Keel Grid Finalised - Ep. 421 RAN Sailing

20 December 2024 · 22 min · 118K views · Sweden

What this video covers

Johan and Malin complete the keel grid lamination for their boat build, transitioning from structural stringer work to interior bulkhead installation.21:19 The process involves laminating stringers in cold conditions, requiring a temporary plastic enclosure around the hull and a 25–30 kilowatt diesel heater to maintain an internal temperature of 13–14 degrees Celsius.15:17 To improve efficiency, the team uses a saturation table equipped with an infrared heater to pre-saturate fiberglass layers before application.7:43 Despite these preparations, the work proves time-consuming due to the complex geometry of the stringers, which feature 90-degree corners and limber holes.11:57 Vacuum bagging the laminate presents further challenges, exacerbated by a degrading vacuum pump that struggles to evacuate air quickly, forcing the crew to meticulously seal even minor leaks to maintain proper pressure.20:26 After three days of intensive labor, the keel grid is finalized, marking the end of the structural foundation phase.19:29

Watch on YouTube

More from RAN Sailing

Something's Not Right Here! Building Our 52ft Sailboat - Ep. 502Sept 2026This Is Where Boat Builds Break People - Ep. 501 Ran SailingAug 2026Our 52ft Sailboat Build Reaches Another Milestone! - Ep. 500 Ran SailingAug 2026How Many Hatches Does a 52ft Sailboat Need? - Ep. 499 Ran SailingAug 2026

From RAN Sailing — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue