Project Brupegvídeo

Brupeg goes Grey... (again) - Project Brupeg Ep. 239

16 de enero de 2022 · 28 min · 70K visitas

Qué cubre este vídeo

Damien and his volunteer crew apply the topcoat to the 57-foot steel trawler BrewPeg using an air-spray system.0:54 To achieve uniform coverage, the team switches from a 3.5mm nozzle to a 2.5mm nozzle, which provides better control over the spray fan and reduces paint consumption.3:05 The crew maintains a 50% overlap during application to ensure an even finish.4:23 Because the topcoat requires a 20% to 25% thinning ratio for air spraying, the team uses only 10 liters of paint for the first coat, half the amount used for the high-build primer.19:20 They store leftover catalyzed paint in a refrigerator overnight to extend its pot life, later testing its viscosity with a drill before adding more thinners for reuse.19:15 The project involves significant manual labor, including painting over temporary window covers and using rollers for underwater sections where finish quality is secondary to volume.16:35

Ver en YouTube

Más de Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463oct 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462sept 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461sept 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460sept 2026

De Project Brupeg — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema