Project Brupegvidéo

Brupeg goes Grey... (again) - Project Brupeg Ep. 239

16 janvier 2022 · 28 min · 70K vues

Ce que couvre cette vidéo

Damien and his volunteer crew apply the topcoat to the 57-foot steel trawler BrewPeg using an air-spray system.0:54 To achieve uniform coverage, the team switches from a 3.5mm nozzle to a 2.5mm nozzle, which provides better control over the spray fan and reduces paint consumption.3:05 The crew maintains a 50% overlap during application to ensure an even finish.4:23 Because the topcoat requires a 20% to 25% thinning ratio for air spraying, the team uses only 10 liters of paint for the first coat, half the amount used for the high-build primer.19:20 They store leftover catalyzed paint in a refrigerator overnight to extend its pot life, later testing its viscosity with a drill before adding more thinners for reuse.19:15 The project involves significant manual labor, including painting over temporary window covers and using rollers for underwater sections where finish quality is secondary to volume.16:35

Regarder sur YouTube

Plus de vidéos de Project Brupeg

How strong to you want this winch mount? Brupeg strong... Project Brupeg Ep.457août 2026Was the outboard rebuild worth it and Brupeg has developed a worrying noise... Project Brupeg Ep.456août 2026Three Builds, One Croc Sanctuary: Boat Life on Brupeg - Project Brupeg Ep.455août 2026Brupeg's 1st Drone, Green Island & Boatwork - Project Brupeg Ep.454juil. 2026

De Project Brupeg — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème