Project Brupegvídeo

Brupeg goes Grey... (again) - Project Brupeg Ep. 239

16 de janeiro de 2022 · 28 min · 70K visualizações

O que este vídeo aborda

Damien and his volunteer crew apply the topcoat to the 57-foot steel trawler BrewPeg using an air-spray system.0:54 To achieve uniform coverage, the team switches from a 3.5mm nozzle to a 2.5mm nozzle, which provides better control over the spray fan and reduces paint consumption.3:05 The crew maintains a 50% overlap during application to ensure an even finish.4:23 Because the topcoat requires a 20% to 25% thinning ratio for air spraying, the team uses only 10 liters of paint for the first coat, half the amount used for the high-build primer.19:20 They store leftover catalyzed paint in a refrigerator overnight to extend its pot life, later testing its viscosity with a drill before adding more thinners for reuse.19:15 The project involves significant manual labor, including painting over temporary window covers and using rollers for underwater sections where finish quality is secondary to volume.16:35

Assistir no YouTube

Mais de Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463out. de 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462set. de 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461set. de 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460set. de 2026

De Project Brupeg — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema