Project Brupegvídeo

Moving a Freezer Below Deck - Project Brupeg Ep. 172

21 de septiembre de 2020 · 18 min · 30K visitas

Qué cubre este vídeo

The crew of the converted fishing trawler Project Brupeg prepares to relocate a 125-liter water tank from the saloon to the engine bay to clear space for a new freezer.0:31 To facilitate moving heavy equipment through the saloon hatch, the team fabricates and welds a stainless steel lifting eye to the overhead ribs.3:05 Because the freezer’s dimensions conflict with recently installed ventilation pipes, the crew opts to remove the vents temporarily rather than weld them in place, highlighting the importance of maintaining access for future maintenance.9:21 The project also involves draining the water tank, which serves as a template for the new mounting platform in the engine bay.10:03 Additionally, the crew relocates engine batteries back to the engine room after using them to power stabilizer winches.12:37 The episode concludes with the fabrication of a custom anchor for a friend, utilizing a 12mm steel plate bent in a brake press to save on replacement costs.16:25 Proper planning of equipment access and modular design simplifies complex interior refits.

Ver en YouTube

Más de Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463oct 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462sept 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461sept 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460sept 2026

De Project Brupeg — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema