Project Brupegvídeo
Moving a Freezer Below Deck - Project Brupeg Ep. 172
21 de septiembre de 2020 · 18 min · 30K visitas
Qué cubre este vídeo
The crew of the converted fishing trawler Project Brupeg prepares to relocate a 125-liter water tank from the saloon to the engine bay to clear space for a new freezer.0:31 To facilitate moving heavy equipment through the saloon hatch, the team fabricates and welds a stainless steel lifting eye to the overhead ribs.3:05 Because the freezer’s dimensions conflict with recently installed ventilation pipes, the crew opts to remove the vents temporarily rather than weld them in place, highlighting the importance of maintaining access for future maintenance.9:21 The project also involves draining the water tank, which serves as a template for the new mounting platform in the engine bay.10:03 Additionally, the crew relocates engine batteries back to the engine room after using them to power stabilizer winches.12:37 The episode concludes with the fabrication of a custom anchor for a friend, utilizing a 12mm steel plate bent in a brake press to save on replacement costs.16:25 Proper planning of equipment access and modular design simplifies complex interior refits.
Más de Project Brupeg
De Project Brupeg — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



