Project Brupegvideo
Moving a Freezer Below Deck - Project Brupeg Ep. 172
September 21, 2020 · 18 min · 30K views
What this video covers
The crew of the converted fishing trawler Project Brupeg prepares to relocate a 125-liter water tank from the saloon to the engine bay to clear space for a new freezer.0:31 To facilitate moving heavy equipment through the saloon hatch, the team fabricates and welds a stainless steel lifting eye to the overhead ribs.3:05 Because the freezer’s dimensions conflict with recently installed ventilation pipes, the crew opts to remove the vents temporarily rather than weld them in place, highlighting the importance of maintaining access for future maintenance.9:21 The project also involves draining the water tank, which serves as a template for the new mounting platform in the engine bay.10:03 Additionally, the crew relocates engine batteries back to the engine room after using them to power stabilizer winches.12:37 The episode concludes with the fabrication of a custom anchor for a friend, utilizing a 12mm steel plate bent in a brake press to save on replacement costs.16:25 Proper planning of equipment access and modular design simplifies complex interior refits.
More from Project Brupeg
From Project Brupeg — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



