Project Brupegvidéo
Moving a Freezer Below Deck - Project Brupeg Ep. 172
21 septembre 2020 · 18 min · 30K vues
Ce que couvre cette vidéo
The crew of the converted fishing trawler Project Brupeg prepares to relocate a 125-liter water tank from the saloon to the engine bay to clear space for a new freezer.0:31 To facilitate moving heavy equipment through the saloon hatch, the team fabricates and welds a stainless steel lifting eye to the overhead ribs.3:05 Because the freezer’s dimensions conflict with recently installed ventilation pipes, the crew opts to remove the vents temporarily rather than weld them in place, highlighting the importance of maintaining access for future maintenance.9:21 The project also involves draining the water tank, which serves as a template for the new mounting platform in the engine bay.10:03 Additionally, the crew relocates engine batteries back to the engine room after using them to power stabilizer winches.12:37 The episode concludes with the fabrication of a custom anchor for a friend, utilizing a 12mm steel plate bent in a brake press to save on replacement costs.16:25 Proper planning of equipment access and modular design simplifies complex interior refits.
Plus de vidéos de Project Brupeg
De Project Brupeg — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



