Sailing Yabávídeo

Building the DECK of our SCHOONER! — Sailing Yabá #45

12 de septiembre de 2021 · 24 min · 125K visitas

Qué cubre este vídeo

The crew of Yabá is rebuilding the deck of their schooner, transitioning from balancing on structural beams to installing deck planks and bulwark supports.Watch To minimize water infiltration, they are using wider planks that feature a decorative, non-caulked groove to simulate the appearance of narrower boards.16:27 The team secures the starboard cover board using stainless steel bars through the beams, filling the resulting holes with an epoxy-sawdust mixture and custom-cut wooden plugs.4:36 To ensure the deck planks remain parallel, they use a taut fishing line stretched from the bow as a guide for marking the beams.20:06 The bulwark construction involves installing temporary rails to align the vertical supports, which are planed to fit tightly against the deck.8:29 The crew also installs internal floor planks between the beams to provide a nailing surface for the deck plank ends and to act as a backing for future caulking.18:46

Ver en YouTube

Más de Sailing Yabá

Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing Yabáago 2026Sailing to Ilha Grande: Prison Island transformed into Tropical Paradise! — Sailing Yabáago 2026This Anchorage Was Worth Every Miserable Mile — Sailing Yabáago 2026Sailing Fully Rigged at Night After Emergency Repairs — Sailing Yabáago 2026

De Sailing Yabá — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema