Sailing Yabávidéo

Building the DECK of our SCHOONER! — Sailing Yabá #45

12 septembre 2021 · 24 min · 125K vues

Ce que couvre cette vidéo

The crew of Yabá is rebuilding the deck of their schooner, transitioning from balancing on structural beams to installing deck planks and bulwark supports.Watch To minimize water infiltration, they are using wider planks that feature a decorative, non-caulked groove to simulate the appearance of narrower boards.16:27 The team secures the starboard cover board using stainless steel bars through the beams, filling the resulting holes with an epoxy-sawdust mixture and custom-cut wooden plugs.4:36 To ensure the deck planks remain parallel, they use a taut fishing line stretched from the bow as a guide for marking the beams.20:06 The bulwark construction involves installing temporary rails to align the vertical supports, which are planed to fit tightly against the deck.8:29 The crew also installs internal floor planks between the beams to provide a nailing surface for the deck plank ends and to act as a backing for future caulking.18:46

Regarder sur YouTube

Plus de vidéos de Sailing Yabá

Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing Yabáaoût 2026Sailing to Ilha Grande: Prison Island transformed into Tropical Paradise! — Sailing Yabáaoût 2026This Anchorage Was Worth Every Miserable Mile — Sailing Yabáaoût 2026Sailing Fully Rigged at Night After Emergency Repairs — Sailing Yabáaoût 2026

De Sailing Yabá — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème