Sailing Yabávídeo

Building the DECK of our SCHOONER! — Sailing Yabá #45

12 de setembro de 2021 · 24 min · 125K visualizações

O que este vídeo aborda

The crew of Yabá is rebuilding the deck of their schooner, transitioning from balancing on structural beams to installing deck planks and bulwark supports.Watch To minimize water infiltration, they are using wider planks that feature a decorative, non-caulked groove to simulate the appearance of narrower boards.16:27 The team secures the starboard cover board using stainless steel bars through the beams, filling the resulting holes with an epoxy-sawdust mixture and custom-cut wooden plugs.4:36 To ensure the deck planks remain parallel, they use a taut fishing line stretched from the bow as a guide for marking the beams.20:06 The bulwark construction involves installing temporary rails to align the vertical supports, which are planed to fit tightly against the deck.8:29 The crew also installs internal floor planks between the beams to provide a nailing surface for the deck plank ends and to act as a backing for future caulking.18:46

Ver no YouTube

Mais de Sailing Yabá

Is a Huge Crew Always Better? (Bittersweet Voyage Surrounded by Whales) — Sailing Yabá10/2026Yabá gets Brand New Sails & Set Sail Immediately!— Sailing Yabá10/2026Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabá09/2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabá09/2026

De Sailing Yabá — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema