Wildling Sailingvídeo

After 16 Months of Hard Work, I Have A Sailing Boat!

16 de agosto de 2024 · 30 min · 143K visitas

Qué cubre este vídeo

A project catamaran, restored over 16 months after suffering from severe rainwater ingress, undergoes initial sea trials and rigging adjustments.0:36 The owner installs a 12mm Dyneema forestay and Hankon sails, noting the need for battens to improve mainsail shape.1:16 During light-wind testing in 8–12 knots, the vessel achieves speeds of 2–4 knots on a beam reach.7:42 The owner fabricates makeshift battens from hardwood to stiffen the mainsail and installs additional cleats and winches to manage sail trim.13:01 With guests on board, the crew replaces a small steering wheel with a larger model sourced from a used boat shop and installs new boarding steps.19:12 The vessel successfully completes a six-mile passage to the island of Hoeft, where the crew practices anchoring under sail to avoid engine use.22:09 Rigging tension and hardware attachments remain secure throughout the trials.26:14 Proper sail trim and the addition of battens significantly improve performance in light air.26:55

Ver en YouTube

Más de Wildling Sailing

One Step Back, One Step Sideways & One Step Forward | My Budget Catamaran Refitoct 2026I Lifted Her Out For a Very Important Rebuild.sept 2026One Final Refit Before Crossing The Atlantic.ago 20262 Days Alone at Sea On my Primitive Double-Canoe.ago 2026

De Wildling Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema