Cruising Mayavídeo
Dock Talk: Ep 1. Winter Boat Projects (Episode 41)
27 de octubre de 2020 · 13 min · 2K visitas · Skagit Valley
Qué cubre este vídeo
Refinishing teak handrails and performing comprehensive engine and system maintenance constitute the primary winter projects for the 38-foot sailboat Maya. The handrail restoration involves removing the wood, sanding to bare grain, and applying five coats of varnish, a process requiring approximately 60 hours of labor.3:07 Engine maintenance includes replacing the raw water impeller, engine anode, and exhaust elbow gasket.3:55 A professional inspection of the heat exchanger reveals rotted internal baffles, necessitating a full unit replacement, which the owners attribute to neglected zinc anodes.5:14 The cooling system undergoes three flushes with a radiator compound to remove debris.6:10 Additional maintenance tasks include replacing a chafed water inlet hose, changing the oil, and cleaning biological buildup from the diesel fuel tank.8:17 Finally, the crew performs an equalization charge on their flooded lead-acid battery bank, requiring four hours of active ventilation to manage hydrogen off-gassing.9:24 Consistent preventative maintenance ensures system reliability for future cruising.
Barcos en este vídeo
Más de Cruising Maya
De Cruising Maya — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



