Cruising Mayavideo

Dock Talk: Ep 1. Winter Boat Projects (Episode 41)

October 27, 2020 · 13 min · 2K views · Skagit Valley

What this video covers

Refinishing teak handrails and performing comprehensive engine and system maintenance constitute the primary winter projects for the 38-foot sailboat Maya. The handrail restoration involves removing the wood, sanding to bare grain, and applying five coats of varnish, a process requiring approximately 60 hours of labor.3:07 Engine maintenance includes replacing the raw water impeller, engine anode, and exhaust elbow gasket.3:55 A professional inspection of the heat exchanger reveals rotted internal baffles, necessitating a full unit replacement, which the owners attribute to neglected zinc anodes.5:14 The cooling system undergoes three flushes with a radiator compound to remove debris.6:10 Additional maintenance tasks include replacing a chafed water inlet hose, changing the oil, and cleaning biological buildup from the diesel fuel tank.8:17 Finally, the crew performs an equalization charge on their flooded lead-acid battery bank, requiring four hours of active ventilation to manage hydrogen off-gassing.9:24 Consistent preventative maintenance ensures system reliability for future cruising.

Watch on YouTube

Boats in this video

Alberg 37Their boat

More from Cruising Maya

Sailing Pacific Mexico: Boat work in exotic locationsDec 2024Sailing Alaska to Washington Offshore 6 Days Non-Stop (Episode 58)Jan 2022Sailing ALASKA: Amazing Natural Hot Springs- and MUCH MORE! (Episode 54)Oct 2021Sailing ALASKA - 18 DAY QUARANTINE SAIL THROUGH CANADA!!! (Episode 50)Jul 2021

From Cruising Maya — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue