Sailing Yabávídeo
We NEED to Get This Boat Ready to Float NOW! — Sailing Yabá
24 de mayo de 2026 · 34 min · 56K visitas
Crew hoists mast on Yabá in dry dock
Qué cubre este vídeo
Refitting an 88-foot wooden boat requires a precise sequence of hull preparation and painting to ensure the anti-fouling remains effective upon launch. The crew cleans the hull of barnacles and biological growth, grinds down to bare wood, and applies epoxy resin to seal exposed areas before priming.0:43 Metal components near the propeller and rudder receive epoxy primer to prevent corrosion, while stainless steel hardware is taped off or coated to avoid galvanic reaction.6:52 The team replaces sharp, protruding nuts on the hull and chain plates with rounded, half-inch versions to prevent injury and protect new sails from snagging.3:57 Because anti-fouling paint degrades when exposed to air and sun, the final application is delayed until immediately before the scheduled launch.4:50 The project timeline remains dependent on the movement of neighboring vessels in the boatyard, forcing the crew to balance hull finishing with secondary tasks like fabricating a new boom for a self-tacking jib and welding a gooseneck assembly.19:54
Destacado en las guías de la flota
Más de Sailing Yabá
De Sailing Yabá — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



