Sailing Yabávídeo

We NEED to Get This Boat Ready to Float NOW! — Sailing Yabá

24 de maio de 2026 · 34 min · 56K visualizações

Crew hoists mast on Yabá in dry dock

O que este vídeo aborda

Refitting an 88-foot wooden boat requires a precise sequence of hull preparation and painting to ensure the anti-fouling remains effective upon launch. The crew cleans the hull of barnacles and biological growth, grinds down to bare wood, and applies epoxy resin to seal exposed areas before priming.0:43 Metal components near the propeller and rudder receive epoxy primer to prevent corrosion, while stainless steel hardware is taped off or coated to avoid galvanic reaction.6:52 The team replaces sharp, protruding nuts on the hull and chain plates with rounded, half-inch versions to prevent injury and protect new sails from snagging.3:57 Because anti-fouling paint degrades when exposed to air and sun, the final application is delayed until immediately before the scheduled launch.4:50 The project timeline remains dependent on the movement of neighboring vessels in the boatyard, forcing the crew to balance hull finishing with secondary tasks like fabricating a new boom for a self-tacking jib and welding a gooseneck assembly.19:54

Assistir no YouTube

Destaque nos guias da frota

Mais de Sailing Yabá

Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing Yabáago. de 2026Sailing to Ilha Grande: Prison Island transformed into Tropical Paradise! — Sailing Yabáago. de 2026This Anchorage Was Worth Every Miserable Mile — Sailing Yabáago. de 2026Sailing Fully Rigged at Night After Emergency Repairs — Sailing Yabáago. de 2026

De Sailing Yabá — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema