Expedition Evansvídeo
24 HOUR Epoxy Scramble | Expedition Evans 18
11 de diciembre de 2020 · 15 min · 156K visitas
Qué cubre este vídeo
Fiberglassing the battery box sections and galley pockets requires a rapid, 24-hour effort to meet a deadline for keel installation.0:47 Brett and Jade Evans prepare the surfaces by sanding existing fiberglass and cleaning with acetone to ensure proper adhesion for new layers.3:53 A sudden rainstorm introduces moisture to the fiberglass cloth, forcing the crew to use a space heater and hair dryers to dry the material before application.2:11 The team mixes epoxy in small batches to prevent exothermic reactions and uses a radius squeegee to apply the resin efficiently.7:38 They transition from using Rocca epoxy to West System epoxy, noting that the latter is more difficult to work with and has a stronger odor.11:28 After completing the layup, the crew achieves the necessary structural progress to proceed with the keel installation.13:56 Proper surface preparation, including sanding and removing peaks or snags, prevents voids in the fiberglass layup.3:50
Más de Expedition Evans
De Expedition Evans — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



