Expedition Evansvídeo

24 HOUR Epoxy Scramble | Expedition Evans 18

11 de dezembro de 2020 · 15 min · 156K visualizações

O que este vídeo aborda

Fiberglassing the battery box sections and galley pockets requires a rapid, 24-hour effort to meet a deadline for keel installation.0:47 Brett and Jade Evans prepare the surfaces by sanding existing fiberglass and cleaning with acetone to ensure proper adhesion for new layers.3:53 A sudden rainstorm introduces moisture to the fiberglass cloth, forcing the crew to use a space heater and hair dryers to dry the material before application.2:11 The team mixes epoxy in small batches to prevent exothermic reactions and uses a radius squeegee to apply the resin efficiently.7:38 They transition from using Rocca epoxy to West System epoxy, noting that the latter is more difficult to work with and has a stronger odor.11:28 After completing the layup, the crew achieves the necessary structural progress to proceed with the keel installation.13:56 Proper surface preparation, including sanding and removing peaks or snags, prevents voids in the fiberglass layup.3:50

Ver no YouTube

Mais de Expedition Evans

What It's Really Like Anchored Off a UNINHABITED Island | EE 17605/2026Why Everyone is QUITTING Sailing | EE 17505/2026We Are No Different Than Any Other Sailor (we might be WORSE) | EE 17403/2026HOW WE EAT? (first we have to catch it) | EE 17303/2026

De Expedition Evans — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema