Project Brupegvídeo

Important Safety Upgrades! - Project Brupeg Ep.439

8 de marzo de 2026 · 21 min · 14K visitas

Qué cubre este vídeo

Fabrication of custom stainless steel handrails for the 10-year rebuild of the former fishing trawler *Brupeg* focuses on improving deck safety.0:03 The crew uses 316-grade, schedule 10 heavy-wall stainless steel tubing to construct the rails, mirroring the height of existing forward sections at 322 millimeters.1:16 To ensure structural integrity and ease of installation, the team pre-welds 90-degree elbows and vertical supports before tacking the assemblies onto the deck.6:01 When the TIG welder fails, the project switches to MIG welding to maintain progress despite intermittent heavy rain and limited workspace.8:13 The design features a leapfrog configuration along the side decks, with the aft section remaining undecided to allow for cargo movement.1:53 The crew prioritizes high rails to compensate for the vessel's original low bulwarks, which were designed for commercial net handling.10:40 Periodic inspections of the hull reveal significant soft marine growth, which the crew expects to slough off once the vessel is underway.17:35

Ver en YouTube

Más de Project Brupeg

Was the outboard rebuild worth it and Brupeg has developed a worrying noise... Project Brupeg Ep.456ago 2026Three Builds, One Croc Sanctuary: Boat Life on Brupeg - Project Brupeg Ep.455ago 2026Brupeg's 1st Drone, Green Island & Boatwork - Project Brupeg Ep.454jul 2026Good Mates & Boat Maintenance - Project Brupeg Ep.453jul 2026

De Project Brupeg — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema